Water projects

The three drilling rigs we have, of capacity to T.D 750 meter, installation Of casing, submersible pumps and water tanks for each well with high efficiency during acceptable time boarder lines. We also able to support the drilling water wells by previous electrical resistivity survey to determine the well depth and possible discharge within short time