Site preparation

A) Leveling of the land. It is alterability and the leveling of the land and lifting debris and dirt (if any) and makes it suitable for layout. B) Water and electricity. Supplying & connecting electrical power and water to the work site, or erecting generator electricity with appropriate efficiency and for water by digging a well or by tanker trucks. C) Temporary fencing. Temporary fence must be established around the project land with a visible main entrance gate. By (BRC or metal panels). D) Work site requirement. Prepare suitable furnished office for supervisor engineer and his aides with all the supplies and supervision requirements. As well as arranging yards and stores for keeping construction materials, and link them to temporary ways for parking and vehicles traffic.